The new roundabout at Executive Dr. and Range Line Rd. is now under construction. The existing signalized intersection will be fully reconstructed to a multi-lane roundabout. The reconstruction will include new full-depth pavement, curb and gutter, an enclosed storm water system, sidewalk, and a cycle track with new curb ramps. Any private drives located within the limits of the intersection reconstruction will be replaced. Access to properties within the project limits will be maintained at all times. Once completed, the roundabout will allow access to the new Proscenium project (at the old Party Time site).
The intersection is now closed until mid-November.