CHA Consulting hosted apublic hearing on Tuesday, December 20, 2022 regarding this project. Please see the exhibits which were discussed at the meeting below:
The purpose of the project is to rehabilitate 236th St east of US 31, from US31 to Deming Road, a distance of 1.5 miles. The scope is to widen the narrow lanes and add 6' paved shoulders. A 10' multi-use path will be added along the south side and improvements to side ditch drainage. Bridge 48 will also be rehabilitated as part of this project.
Reason for Project
The existing roadway possesses a narrow lane width, inadequate shoulders, and inadequate drainage features. In recent years this corridor has experienced an increased traffic volume which has necessitated a review of the current road conditions.
Construction Details
Design Firms: CHA Consulting
Contractor: TBD
Construction Start Date: TBD
Construction Completion (Estimate): TBD
Construction Cost (Estimate): TBD
Funding
The design costs will be funded locally. Construction will be funded by Federal Aid with a local match.