SS#33062 - Strawtown Ave. over Lincoln Smith Drain

Project Information

Current Status

11/17/23: Preliminary Design is underway.
 

Project Location

SS#33062 carries Strawtown Ave. over Lincoln Smith Drain.

Reason for Project

Existing concrete structure has deteriorated at various locations with exposed footing.

Project Scope

New structure roadway geometry is planned to be two 12-foot lane with minimum 4’ shoulder and accommodate Q100 flood event.

Construction Details

  • Design Firm: DLZ
  • Inspection Firm: Hamilton County Highway Department
  • Contractor: TBD
  • Construction Start Date: Summer 2025
  • Construction Completion: Fall 2025
  • Construction Cost: TBD

Funding

Local funding will be utilized for the construction of this project.