11/17/23: Preliminary Design is underway.
SS#33062 carries Strawtown Ave. over Lincoln Smith Drain.
Existing concrete structure has deteriorated at various locations with exposed footing.
New structure roadway geometry is planned to be two 12-foot lane with minimum 4’ shoulder and accommodate Q100 flood event.
Local funding will be utilized for the construction of this project.