SS#32095 - Whistler Rd. over Forkner Ditch

Project Information

Current Status

11/17/23: Utility coordination, right-of-way acquisition, and final design are all underway.
 

Project Location

SS#32095 carries Whistler Rd. over Forkner DItch.

Reason for Project

Existing structures are dual pipes at various stages of deterioration at various locations.

Project Scope

New structure roadway geometry is planned to be two 12-foot lane with minimum 4’ shoulder and accommodate Q100 flood event for Forkner Ditch.

Construction Details

  • Design Firm: SJCA
  • Inspection Firm: Hamilton County Highway Department
  • Contractor: TBD
  • Construction Start Date: Summer 2025
  • Construction Completion: Fall 2025
  • Construction Cost: TBD

Funding

Local funding will be utilized for the construction of this project.