5/16/23: Design is underway.
Bridge 140 carries Hazel Dell Pkwy. over Cool Creek.
Bridge preservation project to address deterioration. Project work includes a bridge deck overlay, concrete patching, and installing channel scour countermeasures.
Design and Construction will be funded locally.