9/13/23: Preliminary design is underway.
Bridge 56 carries 266th St. over Taylor Creek.
The bridge deck and beams are deteriorated. A superstructure replacement is recommended.
Bridge Rehabilitation – The bridge deck and beams will be replaced.
Design and construction costs will be funded locally.