Reason for Project
The bridge deck and approach slabs are deteriorated and the structure has a posted load limit. A bridge deck overlay is recommended.
Project Scope
Bridge Rehabilitation – The bridge approach slabs will be replaced and a new overlay will be constructed on the bridge deck.
Construction Details
- Design Firm: Infrastructure Engineering
- Inspection Firm: TBD
- Contractor: TBD
- Construction Start Date: Spring 2024
- Construction Completion: Summer 2024
- Construction Cost: TBD
Funding
Design and construction costs will be funded locally.