Bridge #154 - 126th St. over Cool Creek

Project Information

Current Status

11/17/23: Final Design is underway.
 

Project Location

Bridge 154 carries 126th St. over Cool Creek. 

Google_StreetView Opens in new window

Reason for Project

The bridge deck and beams are deteriorated. A superstructure replacement is recommended.

Project Scope

Bridge Rehabilitation – The bridge deck and beams will be replaced. The bridge will be widened to the south to accommodate a future trail.

Construction Details

  • Design Firm: SJCA
  • Inspection Firm: TBD
  • Contractor: TBD
  • Construction Start Date: Summer 2024
  • Construction Completion: Fall 2024
  • Construction Cost: TBD

Funding

Design and construction costs will be funded locally.