Bridge #154 - 126th St. over Cool Creek

Project Information


Current Status


8/27/21: Design is underway.

Project Location


Bridge 154 carries 126th St. over Cool Creek. 
Google_StreetView

Reason for Project

The bridge deck and beams are deteriorated. A superstructure replacement is recommended.



Project Scope


Bridge Rehabilitation – The bridge deck and beams will be replaced. The bridge will be widened to the south to accommodate a future trail.

Construction Details


  • Design Firm: SJCA
  • Inspection Firm: TBD
  • Contractor: TBD
  • Construction Start Date: Spring 2023
  • Construction Completion: Summer 2023
  • Construction Cost: TBD
Funding
Design and construction costs will be funded locally.