Reason for Project
The bridge deck and beams are deteriorated. A superstructure replacement is recommended.
Project Scope
Bridge Rehabilitation – The bridge deck and beams will be replaced. The bridge will be widened to the south to accommodate a future trail.
Construction Details
- Design Firm: SJCA
- Inspection Firm: TBD
- Contractor: TBD
- Construction Start Date: Spring 2023
- Construction Completion: Summer 2023
- Construction Cost: TBD
Funding
Design and construction costs will be funded locally.