11/9/21: Construction is complete. Traffic is now open for traffic on 116th over the White River.
Project Location
Bridge 160 carries 116th St. over White River.
Reason for Project
A preservation project aimed at extending the life of the bridge.
Project Scope
Bridge Rehabilitation – The existing bridge deck overlay will be removed and a new bridge deck overlay will be installed. The existing bridge deck joints will be replaced and beam bearings will be reset.
Construction Details
Design Firm: Clark Dietz
Contractor: ICC Group, Inc.
Construction Start Date: September 20, 2021
Construction Completion: November 9, 2021
Construction Cost: $931,000
Funding
Design and construction costs will be funded locally.