Structures #33016 / #33017 - 256th St. over Deer Creek

Project Information


Current Status


4/27/22: Please be advised, beginning on or after Monday, May 2, 2022, 256th Street between SR-213 and Lacy Road will be closed to all thru traffic for the replacement of two Small Structures. The estimated project completion date is Monday, August 1, 2022.

Local traffic will continue to have access to their homes, while thru traffic is asked to utilize the posted detour route of Lacy Road, 266th Street, and SR-213.

Project Location


Structures #33016 and #33017 are located on 256th St. over Deer Creek just west of State Road 213 in Jackson Township.


close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel

Reason for Project


The two small structures are within a close proximity of each other, and the necessity of the second structure will be evaluated during the design process. The existing geometry of both structures are two lanes with stone shoulders. Deterioration has occurred on both structures at various locations.

Project Scope


The proposed design will replace SS #33016 and eliminate SS #33017.  The new structure geometry shall be two 12-foot lanes, 4’ shoulders, will accommodate a Q100 flood event, and meet current design standards.

Construction Details


  • Design Firm: Hanson Engineering
  • Inspection Firm: Hamilton County Highway Department
  • Contractor: Hoosier Pride
  • Construction Start Date: May 2, 2022
  • Construction Completion: August 1, 2022
  • Construction Cost: $450,000

Funding


Local funding